{"id":33387,"date":"2020-10-03T13:15:54","date_gmt":"2020-10-03T13:15:54","guid":{"rendered":"https:\/\/www.deltae.ee\/lighting\/valgustuse-projekteerimine\/"},"modified":"2021-11-03T13:59:19","modified_gmt":"2021-11-03T13:59:19","slug":"lighting-installation-design-and-construction","status":"publish","type":"page","link":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/","title":{"rendered":"Lighting installation design and construction"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1589998827986{padding-top: 3% !important;padding-bottom: 1% !important;}&#8221;][vc_column width=&#8221;2\/3&#8243;]<header class=\"kd-section-title col-lg-12 text-left solid-line sep-border-width-2 130px   \" ><h1 class=\"separator_on\" >Lighting installation design and construction<\/h1><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" style=\"border-color:#20e4fd\"><\/div><\/div><\/header>[vc_column_text]<span style=\"font-weight: 400;\">When designing a lighting installation in a building, we ensure compliance with the requirements of the lighting installation and maximum visual comfort for the user of the room. By ensuring good working conditions, we ensure the <strong>productivity<\/strong> and <strong>health<\/strong> of employees in the performance of their duties. Replacing traditional light sources one by one often results in overexposure or underexposure, high glare and an unoptimized solution. An unplanned solution is not cost effective.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In order to achieve a proper and purposeful lighting solution, a <strong>lighting calculation<\/strong> is performed. In order to perform lighting calculations, the designed parts of the building are modeled with the necessary detail in a lighting calculation program. During the design, a <strong>cost-benefit calculation<\/strong> is performed, which results in the most optimal solution in terms of initial investment, profitability as well as energy and maintenance costs. The standards EVS-EN 12464-1: 2011 and EVS-EN 12464-2: 2014 set out the quantity and quality requirements for lighting solutions for most workplaces and related areas. In the event of non-standard lighting, the owner of the building must be held responsible in the event of an accident.<\/span>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;33423&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; css=&#8221;.vc_custom_1618917876370{padding-top: 0px !important;}&#8221;][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;10&#8243; equal_height=&#8221;yes&#8221; rtl_reverse=&#8221;yes&#8221; content_placement=&#8221;middle&#8221; css=&#8221;.vc_custom_1603029227319{margin-top: 5% !important;margin-bottom: 2% !important;background-position: 0 0 !important;background-repeat: no-repeat !important;}&#8221;][vc_column width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;33424&#8243; img_size=&#8221;600&#215;600&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text]<strong>The design process always begins with an inspection of the lighting installation, during which the following becomes clear:<\/strong><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">Existing lighting installation current<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Customer concerns about the current lighting installation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Customer expectations for a new lighting installation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Possibilities to control lighting<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Current consumption of luminaires<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Employee satisfaction with the current lighting solution<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Room illuminance<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Uniformity of room illuminance<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Estimated brightness of room lighting<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Possibility to switch luminaires and switching groups<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Cabling condition<\/span><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;10&#8243; equal_height=&#8221;yes&#8221; rtl_reverse=&#8221;yes&#8221; content_placement=&#8221;middle&#8221; css=&#8221;.vc_custom_1590000566661{margin-top: 2% !important;margin-bottom: 2% !important;background-position: 0 0 !important;background-repeat: no-repeat !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<strong>The lighting project describes:<\/strong><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">Precise project definition<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Problems with images of the current lighting installation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Lighting requirements<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Description of new luminaires<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Emergency lighting and its necessity<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Maintenance factor<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Lighting maintenance<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Lighting control principles<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Lighting installation control parameters and achievable savings potential<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Lighting installation visualization options<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Measurement and monitoring of the lighting installation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Basic principles of luminaire installation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Similar work done in the past<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">On the basis of the project, it is possible to prepare a working project on the basis of which the lighting installation is ready to be built and provides important input on the need to implement control logics.<\/span>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;33417&#8243; img_size=&#8221;500&#215;550&#8243; alignment=&#8221;right&#8221; css=&#8221;.vc_custom_1618918294599{margin-bottom: 0px !important;}&#8221;][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;10&#8243; equal_height=&#8221;yes&#8221; rtl_reverse=&#8221;yes&#8221; content_placement=&#8221;middle&#8221; css=&#8221;.vc_custom_1590000566661{margin-top: 2% !important;margin-bottom: 2% !important;background-position: 0 0 !important;background-repeat: no-repeat !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;33392&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; css=&#8221;.vc_custom_1601731471106{margin-bottom: 0px !important;}&#8221;][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<b>Parts of the project<\/b><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">Delimitation of design work<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Lighting parameters<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Description of the existing lighting solution<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Lighting requirements<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Used luminaires<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Maintenance factor and installation maintenance<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Lighting control and automation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Emergency lighting<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Installation and layout<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Lighting calculation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Economic calculation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Solution offer<\/span><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;10&#8243; equal_height=&#8221;yes&#8221; rtl_reverse=&#8221;yes&#8221; content_placement=&#8221;middle&#8221; css=&#8221;.vc_custom_1590000566661{margin-top: 2% !important;margin-bottom: 2% !important;background-position: 0 0 !important;background-repeat: no-repeat !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<b>Lighting installation construction<\/b><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">Preparation of a work project<\/span><\/li>\n<li><span style=\"font-weight: 400;\">If necessary, install new cabling<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Installation of lighting and control equipment<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Lighting installation setting<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Taking into monitoring<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Creating a visualization of a lighting installation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Preparation of enforcement documentation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Customer handover of solution and training<\/span><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;33393&#8243; img_size=&#8221;600&#215;300&#8243; alignment=&#8221;right&#8221; css=&#8221;.vc_custom_1618918357628{margin-bottom: 0px !important;}&#8221;][\/vc_column][\/vc_row][vc_row css=&#8221;.vc_custom_1601731731445{margin-top: 4% !important;margin-bottom: 4% !important;}&#8221;][vc_column]<header class=\"kd-section-title col-lg-12 text-center solid-line sep-border-width-2 130px    vc_custom_1631620364988\" ><h2 class=\"separator_on\" >Lighting installation design process<\/h2><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" style=\"border-color:#20e4fd\"><\/div><\/div><\/header>[vc_single_image image=&#8221;33430&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; css_animation=&#8221;bottom-to-top&#8221;][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1551187421738{margin-top: 5% !important;margin-bottom: 2% !important;}&#8221; el_id=&#8221;register&#8221;][vc_column][vc_row_inner][vc_column_inner width=&#8221;1\/4&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;]<header class=\"kd-section-title col-lg-12 text-center    \" ><h2 class=\"separator_off\" >Order a lighting project or ask for a free consultation!<\/h2><\/header>[vc_empty_space height=&#8221;25px&#8221;]<a  href=\"https:\/\/www.deltae.ee\/en\/contact\/\"  target=\"_self\"  title=\"\" class=\"tt_button    button-center  \" ><span class=\"prim_text\">Contact us<\/span><span class=\" iconita\"><\/span><\/a>[vc_empty_space height=&#8221;25px&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/4&#8243;][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;10&#8243; equal_height=&#8221;yes&#8221; rtl_reverse=&#8221;yes&#8221; content_placement=&#8221;middle&#8221; css=&#8221;.vc_custom_1590000566661{margin-top: 2% !important;margin-bottom: 2% !important;background-position: 0 0 !important;background-repeat: no-repeat !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;]<header class=\"kd-section-title col-lg-12 text-center solid-line sep-border-width-2 130px    vc_custom_1631620499268\" ><h2 class=\"separator_on\" >Schedule of the design and construction process<\/h2><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" style=\"border-color:#20e4fd\"><\/div><\/div><\/header>[vc_single_image image=&#8221;29893&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; css=&#8221;.vc_custom_1601731880014{margin-bottom: 0px !important;}&#8221;][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<\/p>\n<div class=\"container-tabel\">\n<table class=\"rwd-table\" style=\"width: 100.987%; height: 312px;\">\n<tbody>\n<tr style=\"height: 24px;\">\n<th style=\"width: 68.3342%; text-align: left; height: 24px;\">Design process<\/th>\n<th style=\"width: 162.634%; text-align: center; height: 24px;\">Time<\/th>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Site inspection and information gathering<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\">1. week<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Customer training and approval of conditions<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\">2. week<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Design and models<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\">2. \u2013 4. week<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Economic calculations<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\">5. week<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Project presentation<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\">5. week<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>[\/vc_column_text][vc_column_text css=&#8221;.vc_custom_1631620736926{margin-top: 2% !important;}&#8221;]<\/p>\n<div class=\"container-tabel\">\n<table class=\"rwd-table\" style=\"width: 100.987%; height: 168px;\">\n<tbody>\n<tr style=\"height: 24px;\">\n<td class=\"table tbody th\" style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Construction process<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\"><span style=\"font-size: 1.3em;\">Time<\/span><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Approval of the lighting solution<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\">1. week<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Delivery of luminaires<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\">1.- 6. week<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Preparation of a work project<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\">2. week<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Construction<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\">7. &#8211; 10. week<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Measurement of lighting parameters<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\">After installation<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 68.3342%; text-align: left; height: 24px;\"><span style=\"font-weight: 400;\">Enforcement documentation<\/span><\/td>\n<td style=\"width: 162.634%; text-align: center; height: 24px;\">After installation<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;10&#8243; equal_height=&#8221;yes&#8221; rtl_reverse=&#8221;yes&#8221; content_placement=&#8221;middle&#8221; css=&#8221;.vc_custom_1601732530832{margin-top: 4% !important;margin-bottom: 2% !important;background-position: 0 0 !important;background-repeat: no-repeat !important;}&#8221;][vc_column]<header class=\"kd-section-title col-lg-12 text-center solid-line sep-border-width-2 130px    vc_custom_1631620800720\" ><h2 class=\"separator_on\" >What are the main design and construction errors?<\/h2><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" style=\"border-color:#20e4fd\"><\/div><\/div><\/header>[vc_column_text]<\/p>\n<div class=\"container-tabel\">\n<table class=\"rwd-table\" style=\"width: 100.987%; height: 428px;\">\n<tbody>\n<tr style=\"height: 24px;\">\n<th style=\"width: 32.4892%; height: 24px; text-align: center;\">Problem<\/th>\n<th style=\"width: 198.479%; height: 24px;\">Impact<\/th>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 32.4892%; height: 24px; text-align: center;\">Under lighting<\/td>\n<td style=\"width: 198.479%; height: 24px; text-align: justify;\"><span style=\"font-weight: 400;\">Premises that are too dark make it difficult to perform a task, the long-term effects of which are a deterioration in a person&#8217;s eyesight.lman\u00e4gemine halveneb.<\/span><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 32.4892%; height: 24px; text-align: center;\"><span style=\"font-weight: 400;\">Overexposure<\/span><\/td>\n<td style=\"width: 198.479%; height: 24px; text-align: justify;\"><span style=\"font-weight: 400;\">Excessively light areas cause direct glare and cause the eyes to squint, causing strong tension in the eye muscles. May cause tension headaches and impaired vision.<\/span><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 32.4892%; height: 24px; text-align: center;\">Glare<\/td>\n<td style=\"width: 198.479%; height: 24px; text-align: justify;\"><span style=\"font-weight: 400;\">Glare is a sensation caused by excessively bright areas. To avoid mistakes, fatigue and accidents, it is important that glare is limited. High glare levels are one of the most unanalyzed aspects of lighting design!<\/span><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 32.4892%; height: 24px; text-align: center;\"><span style=\"font-weight: 400;\">Uneven lighting<\/span><\/td>\n<td style=\"width: 198.479%; height: 24px; text-align: justify;\"><span style=\"font-weight: 400;\">Uneven lighting creates a strong light-dark contrast between over-bright and over-dark areas, which forces the human eye to constantly adapt and causes strong tension in the eye muscles. May cause tension headaches and impaired vision.<\/span><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 32.4892%; height: 24px; text-align: center;\"><span style=\"font-weight: 400;\">Flicker<\/span><\/td>\n<td style=\"width: 198.479%; height: 24px; text-align: justify;\"><span style=\"font-weight: 400;\">Perceived flicker can be very disturbing to people both in their free time and especially during work, inhibiting the productivity of their work and the health of the human eye. In photosensitive people, flicker of light can cause seizures in more extreme cases. The effects of flicker are often manifested by tension headaches and rapid eye fatigue.<\/span><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 32.4892%; height: 24px; text-align: center;\"><span style=\"font-weight: 400;\">Wrong choice of finishing materials<\/span><\/td>\n<td style=\"width: 198.479%; height: 24px; text-align: justify;\"><span style=\"font-weight: 400;\">Choosing the wrong finishing materials can cause visual disturbances. For example, a white table top with a high-gloss finish reflects a lot of light and can cause glare if the luminaire&#8217;s illumination angle coincides with the luminaire&#8217;s position. The same effect can occur when exposed to sunlight from the window.<\/span><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 32.4892%; height: 24px; text-align: center;\"><span style=\"font-weight: 400;\">Water in the luminaire<\/span><\/td>\n<td style=\"width: 198.479%; height: 24px; text-align: justify;\"><span style=\"font-weight: 400;\">If the ambient humidity or the possibility of moisture penetrating the luminaire has not been taken into account in the design process and the luminaire protection class has been selected incorrectly, rapid depreciation of the luminaire is expected.<\/span><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 32.4892%; height: 24px; text-align: center;\"><span style=\"font-weight: 400;\">Chemically aggressive environment<\/span><\/td>\n<td style=\"width: 198.479%; height: 24px; text-align: justify;\"><span style=\"font-weight: 400;\">If the design process does not take into account chemicals that are volatile in the environment, then a reaction may occur between the chemical and the luminaire components, leading to breakage of the components and rapid depreciation of the luminaire.<\/span><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 32.4892%; height: 24px; text-align: center;\"><span style=\"font-weight: 400;\">Failure to calculate the maintenance factor<\/span><\/td>\n<td style=\"width: 198.479%; height: 24px; text-align: justify;\"><span style=\"font-weight: 400;\">The maintenance factor shows us how much we need to dimension over the lighting in order to ensure the results prescribed in the initial design task at the end of the luminaire&#8217;s life. This is the most common mistake in the design of luminaires, as a result of which it may happen that the lighting parameters do not meet the agreed requirements after half a lifetime.<\/span><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 32.4892%; height: 24px; text-align: center;\"><span style=\"font-weight: 400;\">Use of ladder tubes<\/span><\/td>\n<td style=\"width: 198.479%; height: 24px; text-align: justify;\"><span style=\"font-weight: 400;\">In order to perform accurate light calculations with LED tubes, it is necessary to install LED tubes in the luminaire used and re-measure the luminaire in order to obtain a correct lighting calculation file. If this is not done, it will not be possible to perform the correct light calculation with LED tubes.<\/span><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 32.4892%; height: 24px; text-align: center;\"><span style=\"font-weight: 400;\">Lack of attention to lighting control<\/span><\/td>\n<td style=\"width: 198.479%; height: 24px; text-align: justify;\"><span style=\"font-weight: 400;\">A well-designed controllable lighting solution ensures up to 70% additional savings in electricity consumption.<\/span><\/td>\n<\/tr>\n<tr style=\"height: 70px;\">\n<td style=\"width: 32.4892%; text-align: center; height: 70px;\"><span style=\"font-weight: 400;\">No test period is applied<\/span><\/td>\n<td style=\"width: 198.479%; text-align: justify; height: 70px;\"><span style=\"font-weight: 400;\">Without the application of the luminaires and their control test period, the lighting installation will remain in operation in the initial setting and will not meet the objectives set in the initial task, as a result of which energy will not be saved. The test period is intended to eliminate configuration errors and anomalies and to make the necessary adjustments.<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"width: 32.4892%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">Incorrect luminaire layout<\/span><\/td>\n<td style=\"width: 198.479%; text-align: justify; height: 23px;\"><span style=\"font-weight: 400;\">Other technical systems are not taken into account in the design and the luminaires are hidden behind the ventilation pipes<\/span><\/td>\n<\/tr>\n<tr style=\"height: 47px;\">\n<td style=\"width: 32.4892%; text-align: center; height: 47px;\"><span style=\"font-weight: 400;\">Cabling errors<\/span><\/td>\n<td style=\"width: 198.479%; text-align: justify; height: 47px;\"><span style=\"font-weight: 400;\">Electricians are not familiar with luminaire control protocols and their cabling, so they do not know how to cabinet luminaires properly. This can result in the luminaires not working or the luminaire control modules burning out.<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1601728824556{margin-top: 3% !important;padding-bottom: 2% !important;}&#8221;][vc_column]<header class=\"kd-section-title col-lg-12 text-center solid-line sep-border-width-2 130px  vs-heading \" ><h2 class=\"separator_on\" >Examples of poor quality solutions<\/h2><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" ><\/div><\/div><\/header>[vc_gallery type=&#8221;image_grid&#8221; images=&#8221;33396,33397,33398,33399,33400,33401,33402,33403,33404,33405,33406,33407&#8243; img_size=&#8221;300&#215;280&#8243; el_class=&#8221;image-gallery&#8221;][vc_empty_space height=&#8221;40px&#8221;][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1601728824556{margin-top: 3% !important;padding-bottom: 2% !important;}&#8221;][vc_column]<header class=\"kd-section-title col-lg-12 text-center solid-line sep-border-width-2 130px  vs-heading \" ><h2 class=\"separator_on\" >Gallery of designed lighting installations<\/h2><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" ><\/div><\/div><\/header>[vc_gallery type=&#8221;image_grid&#8221; images=&#8221;33408,33409,33410,33411,33412,33413,33414,33415,33416,33419,33420,33421&#8243; img_size=&#8221;300&#215;280&#8243; el_class=&#8221;image-gallery&#8221;][vc_empty_space height=&#8221;40px&#8221;][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1551187421738{margin-top: 5% !important;margin-bottom: 2% !important;}&#8221;][vc_column][vc_row_inner][vc_column_inner width=&#8221;1\/4&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;]<header class=\"kd-section-title col-lg-12 text-center    \" ><h2 class=\"separator_off\" >Ask for a free consultation!<\/h2><\/header>[vc_empty_space height=&#8221;25px&#8221;]<a  href=\"https:\/\/www.deltae.ee\/\"  target=\"_self\"  title=\"\" class=\"tt_button    button-center  \" ><span class=\"prim_text\">Contact us<\/span><span class=\" iconita\"><\/span><\/a>[vc_empty_space height=&#8221;25px&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/4&#8243;][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_section][vc_row css=&#8221;.vc_custom_1549963493599{margin-top: 5% !important;}&#8221;][vc_column]<header class=\"kd-section-title col-lg-12 text-center solid-line sep-border-width-2 130px   \" ><h2 class=\"separator_on\" >References<\/h2><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" style=\"border-color:#20e4fd\"><\/div><\/div><\/header>[vc_empty_space height=&#8221;20px&#8221;][vc_masonry_grid post_type=&#8221;portfolio&#8221; max_items=&#8221;-1&#8243; element_width=&#8221;3&#8243; orderby=&#8221;title&#8221; grid_id=&#8221;vc_gid:1635947892012-85561392-4b3c-5&#8243; taxonomies=&#8221;37&#8243; el_class=&#8221;portfolio-categoryitem&#8221;][\/vc_column][\/vc_row][\/vc_section][vc_row][vc_column]<header class=\"kd-section-title col-lg-12 text-center    \" ><h2 class=\"separator_off\" >Want solutions? Contact us!<\/h2><\/header>[vc_empty_space height=&#8221;25px&#8221;]<a  href=\"https:\/\/www.deltae.ee\/en\/contact\/\"  target=\"_self\"  title=\"\" class=\"tt_button    button-center  \" ><span class=\"prim_text\">Contact us<\/span><span class=\" iconita\"><\/span><\/a>[\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1589998827986{padding-top: 3% !important;padding-bottom: 1% !important;}&#8221;][vc_column width=&#8221;2\/3&#8243;][vc_column_text]When designing a lighting installation in a building, we ensure compliance with the requirements of the lighting installation and maximum [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":0,"parent":30345,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"class_list":["post-33387","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lighting installation design and construction | DeltaE<\/title>\n<meta name=\"description\" content=\"Suru\u00f5hu s\u00fcsteemides on v\u00f5imalik saavutada m\u00e4rkimisv\u00e4\u00e4rset energia kokkuhoidu. Professionaalse suru\u00f5hu auditi eesm\u00e4rk on kaardistada k\u00f5ik suru\u00f5hus\u00fcsteemi probleemsed kohad ning leida k\u00f5ik v\u00f5imalikud lahendused.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lighting installation design and construction | DeltaE\" \/>\n<meta property=\"og:description\" content=\"Suru\u00f5hu s\u00fcsteemides on v\u00f5imalik saavutada m\u00e4rkimisv\u00e4\u00e4rset energia kokkuhoidu. Professionaalse suru\u00f5hu auditi eesm\u00e4rk on kaardistada k\u00f5ik suru\u00f5hus\u00fcsteemi probleemsed kohad ning leida k\u00f5ik v\u00f5imalikud lahendused.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"DeltaE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DeltaEInsenerid\" \/>\n<meta property=\"article:modified_time\" content=\"2021-11-03T13:59:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.deltae.ee\/wp-content\/uploads\/2020\/05\/suruohk-ja-toostuslahendused-ettevottele.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"590\" \/>\n\t<meta property=\"og:image:height\" content=\"390\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/lighting\\\/lighting-installation-design-and-construction\\\/\",\"url\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/lighting\\\/lighting-installation-design-and-construction\\\/\",\"name\":\"Lighting installation design and construction | DeltaE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/#website\"},\"datePublished\":\"2020-10-03T13:15:54+00:00\",\"dateModified\":\"2021-11-03T13:59:19+00:00\",\"description\":\"Suru\u00f5hu s\u00fcsteemides on v\u00f5imalik saavutada m\u00e4rkimisv\u00e4\u00e4rset energia kokkuhoidu. Professionaalse suru\u00f5hu auditi eesm\u00e4rk on kaardistada k\u00f5ik suru\u00f5hus\u00fcsteemi probleemsed kohad ning leida k\u00f5ik v\u00f5imalikud lahendused.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/lighting\\\/lighting-installation-design-and-construction\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.deltae.ee\\\/en\\\/lighting\\\/lighting-installation-design-and-construction\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/lighting\\\/lighting-installation-design-and-construction\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lighting\",\"item\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/lighting\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Lighting installation design and construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/\",\"name\":\"DeltaE\",\"description\":\"Energia s&auml;&auml;stmise terviklahendused Sinu ettev&otilde;ttele\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/#organization\",\"name\":\"DeltaE\",\"url\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/lighting\\\/lighting-installation-design-and-construction\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/lighting\\\/lighting-installation-design-and-construction\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DeltaEInsenerid\",\"https:\\\/\\\/ee.linkedin.com\\\/company\\\/deltae-engineering\"],\"legalName\":\"DeltaE Insenerid O\u00dc\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"11\",\"maxValue\":\"50\"},\"address\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/lighting\\\/lighting-installation-design-and-construction\\\/#local-main-place-address\"},\"geo\":{\"@type\":\"GeoCoordinates\",\"latitude\":\"59.400124\",\"longitude\":\"24.6581772\"},\"telephone\":[\"+372 5551 0442\"],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"09:00\",\"closes\":\"17:00\"}],\"email\":\"info@deltae.ee\",\"vatID\":\"EE101617774\"},{\"@type\":\"PostalAddress\",\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/lighting\\\/lighting-installation-design-and-construction\\\/#local-main-place-address\",\"streetAddress\":\"M\u00e4ealuse 2\\\/1\",\"addressLocality\":\"Tallinn\",\"postalCode\":\"12618\",\"addressRegion\":\"Harjumaa\",\"addressCountry\":\"EE\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/lighting\\\/lighting-installation-design-and-construction\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/www.deltae.ee\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/DeltaE-sinine-must_eesti.png\",\"contentUrl\":\"https:\\\/\\\/www.deltae.ee\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/DeltaE-sinine-must_eesti.png\",\"width\":650,\"height\":148,\"caption\":\"DeltaE\"}]}<\/script>\n<meta name=\"geo.placename\" content=\"Tallinn\" \/>\n<meta name=\"geo.position\" content=\"59.400124;24.6581772\" \/>\n<meta name=\"geo.region\" content=\"Estonia\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lighting installation design and construction | DeltaE","description":"Suru\u00f5hu s\u00fcsteemides on v\u00f5imalik saavutada m\u00e4rkimisv\u00e4\u00e4rset energia kokkuhoidu. Professionaalse suru\u00f5hu auditi eesm\u00e4rk on kaardistada k\u00f5ik suru\u00f5hus\u00fcsteemi probleemsed kohad ning leida k\u00f5ik v\u00f5imalikud lahendused.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/","og_locale":"en_US","og_type":"article","og_title":"Lighting installation design and construction | DeltaE","og_description":"Suru\u00f5hu s\u00fcsteemides on v\u00f5imalik saavutada m\u00e4rkimisv\u00e4\u00e4rset energia kokkuhoidu. Professionaalse suru\u00f5hu auditi eesm\u00e4rk on kaardistada k\u00f5ik suru\u00f5hus\u00fcsteemi probleemsed kohad ning leida k\u00f5ik v\u00f5imalikud lahendused.","og_url":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/","og_site_name":"DeltaE","article_publisher":"https:\/\/www.facebook.com\/DeltaEInsenerid","article_modified_time":"2021-11-03T13:59:19+00:00","og_image":[{"width":590,"height":390,"url":"https:\/\/www.deltae.ee\/wp-content\/uploads\/2020\/05\/suruohk-ja-toostuslahendused-ettevottele.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/","url":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/","name":"Lighting installation design and construction | DeltaE","isPartOf":{"@id":"https:\/\/www.deltae.ee\/en\/#website"},"datePublished":"2020-10-03T13:15:54+00:00","dateModified":"2021-11-03T13:59:19+00:00","description":"Suru\u00f5hu s\u00fcsteemides on v\u00f5imalik saavutada m\u00e4rkimisv\u00e4\u00e4rset energia kokkuhoidu. Professionaalse suru\u00f5hu auditi eesm\u00e4rk on kaardistada k\u00f5ik suru\u00f5hus\u00fcsteemi probleemsed kohad ning leida k\u00f5ik v\u00f5imalikud lahendused.","breadcrumb":{"@id":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.deltae.ee\/en\/"},{"@type":"ListItem","position":2,"name":"Lighting","item":"https:\/\/www.deltae.ee\/en\/lighting\/"},{"@type":"ListItem","position":3,"name":"Lighting installation design and construction"}]},{"@type":"WebSite","@id":"https:\/\/www.deltae.ee\/en\/#website","url":"https:\/\/www.deltae.ee\/en\/","name":"DeltaE","description":"Energia s&auml;&auml;stmise terviklahendused Sinu ettev&otilde;ttele","publisher":{"@id":"https:\/\/www.deltae.ee\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.deltae.ee\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/www.deltae.ee\/en\/#organization","name":"DeltaE","url":"https:\/\/www.deltae.ee\/en\/","logo":{"@id":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/#local-main-organization-logo"},"image":{"@id":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/DeltaEInsenerid","https:\/\/ee.linkedin.com\/company\/deltae-engineering"],"legalName":"DeltaE Insenerid O\u00dc","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"11","maxValue":"50"},"address":{"@id":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/#local-main-place-address"},"geo":{"@type":"GeoCoordinates","latitude":"59.400124","longitude":"24.6581772"},"telephone":["+372 5551 0442"],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"09:00","closes":"17:00"}],"email":"info@deltae.ee","vatID":"EE101617774"},{"@type":"PostalAddress","@id":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/#local-main-place-address","streetAddress":"M\u00e4ealuse 2\/1","addressLocality":"Tallinn","postalCode":"12618","addressRegion":"Harjumaa","addressCountry":"EE"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.deltae.ee\/en\/lighting\/lighting-installation-design-and-construction\/#local-main-organization-logo","url":"https:\/\/www.deltae.ee\/wp-content\/uploads\/2019\/10\/DeltaE-sinine-must_eesti.png","contentUrl":"https:\/\/www.deltae.ee\/wp-content\/uploads\/2019\/10\/DeltaE-sinine-must_eesti.png","width":650,"height":148,"caption":"DeltaE"}]},"geo.placename":"Tallinn","geo.position":{"lat":"59.400124","long":"24.6581772"},"geo.region":"Estonia"},"_links":{"self":[{"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/pages\/33387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/comments?post=33387"}],"version-history":[{"count":0,"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/pages\/33387\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/pages\/30345"}],"wp:attachment":[{"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/media?parent=33387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}