{"id":33680,"date":"2020-05-25T16:24:06","date_gmt":"2020-05-25T16:24:06","guid":{"rendered":"https:\/\/www.deltae.ee\/solarenergy\/paikesejaama-projekteerimine\/"},"modified":"2021-11-03T14:05:34","modified_gmt":"2021-11-03T14:05:34","slug":"designing-of-solar-stations","status":"publish","type":"page","link":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/","title":{"rendered":"Designing of solar stations"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row css=&#8221;.vc_custom_1549963493599{margin-top: 5% !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;]<header class=\"kd-section-title col-lg-12 text-left solid-line sep-border-width-2 130px   \" ><h1 class=\"separator_on\" >Designing of solar stations<\/h1><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" style=\"border-color:#20e4fd\"><\/div><\/div><\/header>[vc_column_text el_class=&#8221;loik-pealkiri&#8221;]<\/p>\n<h3>Building a solar park starts with design!<\/h3>\n<p>[\/vc_column_text][vc_column_text]<span style=\"font-weight: 400;\">The aim of the project is to ensure maximum productivity from the investment in the solar power plant. In order for the solution to be long-lasting and to maximize the return on money, the<strong> foundations and construction of the plant must be well-thought-out from the very beginning<\/strong>, and the fastening devices must be purchased from certified manufacturers. Only on the basis of a correctly designed solution is it possible to clearly indicate the investment for the construction of the plant, the payback period and to guarantee the long-term guaranteed cash flow productivity of the plant. Imagine that you are building a house with no drawings and stones are just being laid \u2013 acting this way and assuming that the solution will be good is not sensible!<\/span>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_empty_space height=&#8221;72px&#8221;][vc_single_image image=&#8221;33681&#8243; img_size=&#8221;700&#215;2000&#8243; alignment=&#8221;center&#8221; css=&#8221;.vc_custom_1618911996048{margin-bottom: 0px !important;}&#8221; el_class=&#8221;intro-pilt&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_empty_space][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;33683&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; css=&#8221;.vc_custom_1590424465389{margin-bottom: 0px !important;}&#8221; el_class=&#8221;kaardistus-pilt&#8221;][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text el_class=&#8221;justify-list&#8221;]<\/p>\n<h6>The design begins with a thorough inspection, during which the main aspects of the design are identified.<\/h6>\n<ul>\n<li><span style=\"font-weight: 400;\">Mapping how large, reasonable and optimal a solar power plant is possible to design\/build considering the company&#8217;s energy consumption profile.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Roof covering material, roof slope, direction to weather maps, estimated load capacity.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">It will be determined whether it is more optimal to install the station on the roof or on the ground.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Possible connection of the station either directly to a large consumer\/device (e.g. refrigeration unit) or to the main panel of a building.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Possible installation location of the inverter.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">The passage of cable routes and the entry of the power cable into the building.<\/span><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_empty_space][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243;][vc_column_text el_class=&#8221;loik-pealkiri&#8221;]<\/p>\n<h3>The solar power plant project determines:<\/h3>\n<p>[\/vc_column_text][vc_column_text]<\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">the location of the station on the territory and in relation to the weather maps<\/span><\/li>\n<li><span style=\"font-weight: 400;\">power of the station<\/span><\/li>\n<li><span style=\"font-weight: 400;\">connection to the building&#8217;s electrical and automation system<\/span><\/li>\n<li><span style=\"font-weight: 400;\">the maximum and optimal number of panels to be installed<\/span><\/li>\n<li><span style=\"font-weight: 400;\">installation features<\/span><\/li>\n<li><span style=\"font-weight: 400;\">the number of panels in one circuit<\/span><\/li>\n<li><span style=\"font-weight: 400;\">the mounting solution used<\/span><\/li>\n<li><span style=\"font-weight: 400;\">production forecast<\/span><\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_column_text css=&#8221;.vc_custom_1631692894557{padding-top: 2% !important;}&#8221;]<span style=\"font-weight: 400;\">Based on the project, it is possible to apply for a building permit and a later use permit from the local government. After receiving the use permit, a completed form must be sent to Elektrilevi to receive renewable energy support.<\/span>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;33684&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; css=&#8221;.vc_custom_1590428884138{margin-bottom: 0px !important;}&#8221; el_class=&#8221;jaam-pilt&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_empty_space][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;33685&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; css=&#8221;.vc_custom_1590425213822{margin-bottom: 0px !important;}&#8221; el_class=&#8221;kaardistus-pilt&#8221;][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text el_class=&#8221;loik-pealkiri&#8221;]<\/p>\n<h3>Parts of the project<\/h3>\n<p>[\/vc_column_text][vc_column_text]<\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">Explanatory memorandum<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Position plan<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Structure diagram of the main shield<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Solar switchboard<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Wiring diagram of the panels<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Monitoring system<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Communication solution<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Voltage drop calculation<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Inverter connection diagram<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Newsletters<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Maintenance requirements and instructions<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Economic calculation<\/span><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1584578348358{margin-top: 2% !important;margin-bottom: 5% !important;padding-top: 5% !important;}&#8221; el_class=&#8221;meie&#8221;][vc_column]<header class=\"kd-section-title col-lg-12 text-center solid-line sep-border-width-2 130px   \" ><h2 class=\"separator_on\" >Design process of a solar station<\/h2><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" ><\/div><\/div><\/header>[vc_empty_space height=&#8221;15px&#8221;][vc_single_image image=&#8221;33528&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; onclick=&#8221;link_image&#8221;][vc_row_inner equal_height=&#8221;yes&#8221; gap=&#8221;30&#8243; css=&#8221;.vc_custom_1585821257675{padding-top: 4% !important;padding-bottom: 1% !important;}&#8221;][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text el_class=&#8221;tervikprotsess-2&#8243;]<\/p>\n<h3 style=\"text-align: center;\">Schedule the design process<\/h3>\n<p>[\/vc_column_text][vc_column_text]<\/p>\n<div class=\"keskmised-tulemused-table\">\n<table style=\"border-collapse: collapse; width: 100%; height: 201px;\">\n<tbody>\n<tr style=\"height: 63px;\">\n<td style=\"height: 63px;\">\n<h5>Stage<\/h5>\n<\/td>\n<td style=\"text-align: center; height: 63px;\">\n<h5>Time<\/h5>\n<\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"height: 23px;\"><span style=\"font-weight: 400;\">Site inspection and information gathering <\/span><\/td>\n<td style=\"text-align: center; height: 23px;\">1. week<\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"height: 23px;\"><span style=\"font-weight: 400;\">Pre-presentation of the project <\/span><\/td>\n<td style=\"text-align: center; height: 23px;\">2. week<\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"height: 23px;\"><span style=\"font-weight: 400;\">Project preparation<\/span><\/td>\n<td style=\"text-align: center; height: 23px;\">2. &#8211; 3. week<\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"height: 23px;\"><span style=\"font-weight: 400;\">Issuance of technical conditions of Elektrilevi<\/span><\/td>\n<td style=\"text-align: center; height: 23px;\">up to 60 days<\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"height: 23px;\"><span style=\"font-weight: 400;\">Preparation of solutions and offers<\/span><\/td>\n<td style=\"text-align: center; height: 23px;\">4. week<\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"height: 23px;\"><span style=\"font-weight: 400;\">Presentation of the project to the client<\/span><\/td>\n<td style=\"text-align: center; height: 23px;\">5. week<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243; offset=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][vc_single_image image=&#8221;33686&#8243; img_size=&#8221;full&#8221;][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1590429077136{margin-top: 2% !important;margin-bottom: 2% !important;}&#8221; el_id=&#8221;register&#8221;][vc_column][vc_row_inner][vc_column_inner width=&#8221;1\/4&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;]<header class=\"kd-section-title col-lg-12 text-center    \" ><h2 class=\"separator_off\" >Order a solar park project or ask for a free consultation!<\/h2><\/header>[vc_empty_space height=&#8221;25px&#8221;]<a  href=\"https:\/\/www.deltae.ee\/en\/contact\/\"  target=\"_self\"  title=\"\" class=\"tt_button    button-center  \" ><span class=\"prim_text\">Contact us<\/span><span class=\" iconita\"><\/span><\/a>[vc_empty_space height=&#8221;25px&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/4&#8243;][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column]<header class=\"kd-section-title col-lg-12 text-center solid-line sep-border-width-2 130px  vs-heading \" ><h2 class=\"separator_on\" >What are the main design and construction errors?<\/h2><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" ><\/div><\/div><\/header>[vc_row_inner][vc_column_inner width=&#8221;1\/12&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;5\/6&#8243;][vc_column_text]<\/p>\n<div class=\"container-tabel\">\n<table class=\"rwd-table\" style=\"width: 100%; height: 369px;\">\n<tbody>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><strong>Problem<\/strong><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><strong>Impact<\/strong><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">AC power cables are underdimensioned <\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Fire hazard, voltage drop, decreased income<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">The formation of shadows is not taken into account (trees, chimneys, ventilation hatches, roof edge, etc.)<\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Lower productivity, non-productive circuits<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">Too few inverter circuits <\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Lower productivity and financial loss<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">Too few panels or the distribution of panels in the chain is incorrect<\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Lower productivity, financial losses and the station will be operational significantly later<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">Low quality manufacturer&#8217;s panels<\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Lower productivity, shorter service life, shorter production cycle, risk of fire<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">The solar station does not need maintenance \u2013 WRONG! <\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Fire hazard, lower productivity, risk of plant destruction<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">Incorrect installation of inverters\u00a0 <\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Lower efficiency and additional cooling required<\/span><\/td>\n<\/tr>\n<tr style=\"height: 47px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 47px;\"><span style=\"font-weight: 400;\">Wrong inverter selection<\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 47px;\"><span style=\"font-weight: 400;\">Loss of production, low response speed, no after-sales service, solving problems is time and money consuming<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">Incorrect calculation of wind load\u00a0 <\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Panels fly off the roof, roof damage, dangerous to people<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">Incorrectly selected protection devices <\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Protection is applied too early, risk of fire<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">Wrong cable selection <\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Investment under- or over-dimensioned, installation complexity, risk of circuit breakage, cable damage<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">Wrong mounting angle<\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Panels fly off the roof, roof damage, dangerous to people, low productivity<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">Wrong choice of mounting and fastening accessories<\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">The panels fly off the roof, the roof is damaged, the roof starts to run through<\/span><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"vertical-align: middle; width: 50%; text-align: center; height: 23px;\"><span style=\"font-weight: 400;\">Non-use of cable trays <\/span><\/td>\n<td style=\"width: 50%; text-align: center; vertical-align: middle; height: 23px;\"><span style=\"font-weight: 400;\">Risk of mechanical damage to cables, risk of short circuit, dangerous maintenance<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/12&#8243;][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221;][vc_column]<header class=\"kd-section-title col-lg-12 text-center solid-line sep-border-width-2 130px  vs-heading \" ><h2 class=\"separator_on\" >Examples of poor quality solutions<\/h2><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" ><\/div><\/div><\/header>[vc_gallery type=&#8221;image_grid&#8221; images=&#8221;33688,33689,33690,33691,33693,33694,33695&#8243; img_size=&#8221;300&#215;280&#8243; el_class=&#8221;image-gallery&#8221;][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; css=&#8221;.vc_custom_1551256733336{margin-top: 5% !important;margin-bottom: 2% !important;}&#8221;][vc_column][vc_row_inner][vc_column_inner width=&#8221;1\/4&#8243;][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;]<header class=\"kd-section-title col-lg-12 text-center    \" ><h2 class=\"separator_off\" >Order a solar park project or ask for a free consultation!<\/h2><\/header>[vc_empty_space height=&#8221;25px&#8221;]<a  href=\"https:\/\/www.deltae.ee\/en\/contact\/\"  target=\"_self\"  title=\"\" class=\"tt_button    button-center  \" ><span class=\"prim_text\">Contact us<\/span><span class=\" iconita\"><\/span><\/a>[vc_empty_space height=&#8221;25px&#8221;][\/vc_column_inner][vc_column_inner width=&#8221;1\/4&#8243;][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row disable_element=&#8221;yes&#8221; css=&#8221;.vc_custom_1587174799348{margin-top: 5% !important;}&#8221;][vc_column]<header class=\"kd-section-title col-lg-12 text-center solid-line sep-border-width-2 130px   \" ><h2 class=\"separator_on\" >Valdkonna referentsid<\/h2><div class=\"kd-separator below_title\" style=\"width:130px;\"><div class=\"kd-separator-line\" style=\"border-color:#20e4fd\"><\/div><\/div><\/header>[vc_empty_space height=&#8221;20px&#8221;][\/vc_column][\/vc_row][vc_column width=&#8221;1\/4&#8243;][\/vc_column]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row css=&#8221;.vc_custom_1549963493599{margin-top: 5% !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text el_class=&#8221;loik-pealkiri&#8221;] Building a solar park starts with design! [\/vc_column_text][vc_column_text]The aim of the project is to ensure maximum productivity from the investment in [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":0,"parent":30575,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"class_list":["post-33680","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.3 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Designing of solar stations | DeltaE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Designing of solar stations | DeltaE\" \/>\n<meta property=\"og:description\" content=\"[vc_row css=&#8221;.vc_custom_1549963493599{margin-top: 5% !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text el_class=&#8221;loik-pealkiri&#8221;] Building a solar park starts with design! [\/vc_column_text][vc_column_text]The aim of the project is to ensure maximum productivity from the investment in [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/\" \/>\n<meta property=\"og:site_name\" content=\"DeltaE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DeltaEInsenerid\" \/>\n<meta property=\"article:modified_time\" content=\"2021-11-03T14:05:34+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/solarenergy\\\/designing-of-solar-stations\\\/\",\"url\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/solarenergy\\\/designing-of-solar-stations\\\/\",\"name\":\"Designing of solar stations | DeltaE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/#website\"},\"datePublished\":\"2020-05-25T16:24:06+00:00\",\"dateModified\":\"2021-11-03T14:05:34+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/solarenergy\\\/designing-of-solar-stations\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.deltae.ee\\\/en\\\/solarenergy\\\/designing-of-solar-stations\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/solarenergy\\\/designing-of-solar-stations\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Solar energy\",\"item\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/solarenergy\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Designing of solar stations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/\",\"name\":\"DeltaE\",\"description\":\"Energia s&auml;&auml;stmise terviklahendused Sinu ettev&otilde;ttele\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/#organization\",\"name\":\"DeltaE\",\"url\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/solarenergy\\\/designing-of-solar-stations\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/solarenergy\\\/designing-of-solar-stations\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DeltaEInsenerid\",\"https:\\\/\\\/ee.linkedin.com\\\/company\\\/deltae-engineering\"],\"legalName\":\"DeltaE Insenerid O\u00dc\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"11\",\"maxValue\":\"50\"},\"address\":{\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/solarenergy\\\/designing-of-solar-stations\\\/#local-main-place-address\"},\"geo\":{\"@type\":\"GeoCoordinates\",\"latitude\":\"59.400124\",\"longitude\":\"24.6581772\"},\"telephone\":[\"+372 5551 0442\"],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"09:00\",\"closes\":\"17:00\"}],\"email\":\"info@deltae.ee\",\"vatID\":\"EE101617774\"},{\"@type\":\"PostalAddress\",\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/solarenergy\\\/designing-of-solar-stations\\\/#local-main-place-address\",\"streetAddress\":\"M\u00e4ealuse 2\\\/1\",\"addressLocality\":\"Tallinn\",\"postalCode\":\"12618\",\"addressRegion\":\"Harjumaa\",\"addressCountry\":\"EE\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.deltae.ee\\\/en\\\/solarenergy\\\/designing-of-solar-stations\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/www.deltae.ee\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/DeltaE-sinine-must_eesti.png\",\"contentUrl\":\"https:\\\/\\\/www.deltae.ee\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/DeltaE-sinine-must_eesti.png\",\"width\":650,\"height\":148,\"caption\":\"DeltaE\"}]}<\/script>\n<meta name=\"geo.placename\" content=\"Tallinn\" \/>\n<meta name=\"geo.position\" content=\"59.400124;24.6581772\" \/>\n<meta name=\"geo.region\" content=\"Estonia\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Designing of solar stations | DeltaE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/","og_locale":"en_US","og_type":"article","og_title":"Designing of solar stations | DeltaE","og_description":"[vc_row css=&#8221;.vc_custom_1549963493599{margin-top: 5% !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text el_class=&#8221;loik-pealkiri&#8221;] Building a solar park starts with design! [\/vc_column_text][vc_column_text]The aim of the project is to ensure maximum productivity from the investment in [&hellip;]","og_url":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/","og_site_name":"DeltaE","article_publisher":"https:\/\/www.facebook.com\/DeltaEInsenerid","article_modified_time":"2021-11-03T14:05:34+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/","url":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/","name":"Designing of solar stations | DeltaE","isPartOf":{"@id":"https:\/\/www.deltae.ee\/en\/#website"},"datePublished":"2020-05-25T16:24:06+00:00","dateModified":"2021-11-03T14:05:34+00:00","breadcrumb":{"@id":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.deltae.ee\/en\/"},{"@type":"ListItem","position":2,"name":"Solar energy","item":"https:\/\/www.deltae.ee\/en\/solarenergy\/"},{"@type":"ListItem","position":3,"name":"Designing of solar stations"}]},{"@type":"WebSite","@id":"https:\/\/www.deltae.ee\/en\/#website","url":"https:\/\/www.deltae.ee\/en\/","name":"DeltaE","description":"Energia s&auml;&auml;stmise terviklahendused Sinu ettev&otilde;ttele","publisher":{"@id":"https:\/\/www.deltae.ee\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.deltae.ee\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/www.deltae.ee\/en\/#organization","name":"DeltaE","url":"https:\/\/www.deltae.ee\/en\/","logo":{"@id":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/#local-main-organization-logo"},"image":{"@id":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/DeltaEInsenerid","https:\/\/ee.linkedin.com\/company\/deltae-engineering"],"legalName":"DeltaE Insenerid O\u00dc","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"11","maxValue":"50"},"address":{"@id":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/#local-main-place-address"},"geo":{"@type":"GeoCoordinates","latitude":"59.400124","longitude":"24.6581772"},"telephone":["+372 5551 0442"],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"09:00","closes":"17:00"}],"email":"info@deltae.ee","vatID":"EE101617774"},{"@type":"PostalAddress","@id":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/#local-main-place-address","streetAddress":"M\u00e4ealuse 2\/1","addressLocality":"Tallinn","postalCode":"12618","addressRegion":"Harjumaa","addressCountry":"EE"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.deltae.ee\/en\/solarenergy\/designing-of-solar-stations\/#local-main-organization-logo","url":"https:\/\/www.deltae.ee\/wp-content\/uploads\/2019\/10\/DeltaE-sinine-must_eesti.png","contentUrl":"https:\/\/www.deltae.ee\/wp-content\/uploads\/2019\/10\/DeltaE-sinine-must_eesti.png","width":650,"height":148,"caption":"DeltaE"}]},"geo.placename":"Tallinn","geo.position":{"lat":"59.400124","long":"24.6581772"},"geo.region":"Estonia"},"_links":{"self":[{"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/pages\/33680","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/comments?post=33680"}],"version-history":[{"count":0,"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/pages\/33680\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/pages\/30575"}],"wp:attachment":[{"href":"https:\/\/www.deltae.ee\/en\/wp-json\/wp\/v2\/media?parent=33680"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}